1·The analysis of a dam foundation is carried out.
并对某坝基变形进行了分析。
2·By curtain grouting, the dam foundation is reinforced and the leakage is reduced.
经过坝基防渗补强灌浆,加强了坝基质量,减少了渗漏。
3·Uncertainty may exist in dealing with the mechanism of local uplift anomaly on dam foundation.
坝基局部扬压力异常机理的分析中通常存在不确定性。
4·The article aims to solve the problem of the dam foundation seepage of the Gongshang reservoir.
本文的研究工作是为解决弓上水库的坝基渗漏问题而展开的应用研究。
5·Seepage and seepage-pressure are important factors which influence the stability of dam foundation.
渗流、渗压是影响坝基稳定的重要因素。
6·The rock mass of dam foundation of Zaoshi Hydroproject is mainly fine silicarenite with soft layers.
皂市水利枢纽坝基岩体主要为石英细砂岩夹软弱夹层。
7·The case study of dam foundation seepage exploration of Chongqing Reservoir shows the great effects.
在崇青水库坝基渗漏勘查中收到了良好的效果。
8·The contrast test in made with clay solidification slurry and cement grant in permeable dam foundation.
用粘土固化浆与水泥浆在坝基强透水地层做了高喷截渗时比试验。
9·The dam foundation engineering geological problem is the bed rock deep weathering in Malutang water complex.
马鹿塘水利枢纽坝基主要工程地质问题就是基岩深风化问题。
10·Concrete dam displacement, especial for dam foundation or arch support, is an important target to judge the safety.
混凝土大坝的变形,尤其是坝基和拱座的变形,是衡量工程安全与否的一个重要指标。
1·The data from a large - scale consolidation test are important for the stress and strain analysis of a dam foundation.
大型固结试验所获得的参数,是坝基应力应变分析的重要数据,而此项试验研究工作,在东北地区尚未广泛开展。
2·In consideration of the rock characteristics, formation, rock structure, unloading and weathering, the quality of rock body in the dam foundation has been classified.
在考虑了岩性、构造、岩体结构、卸荷和风化等诸因素后,对大坝坝基岩体进行了岩体质量类别划分。
3·The dam foundation engineering geological problem is the bed rock deep weathering in Malutang water complex.
马鹿塘水利枢纽坝基主要工程地质问题就是基岩深风化问题。
4·In the Chongqing Jiangkou Hydroelectric Power Station, dam foundation stress cycle grows multitudinous bands, faults, limestone caves and other disadvantageous geological combination.
重庆江口水电站坝基应力范围内发育众多夹层、断层、溶洞等不利地质组合。
5·Introduced in the paper are the principle and method of borehole elastic modulus inspection and sound wave inspection used in the quality inspection of grouted rock mass of a dam foundation.
主要介绍采用钻孔弹模法和声波法对灌浆处理后的坝基岩体进行质量检测的原理和方法。